Remodeling a master bathroom is definitely a big project you don’t want to mess up, so making sure that everything is in order, even if it eats up a significant amount of time, is the go-to option. But how much time should a master bathroom revamp actually take?
There are many factors that determine the total length of your master bathroom remodel. Right from the demolition to the final stages, you need to be aware of the total bathroom remodel process before you begin your remodel.
Master Bathroom Remodeling Timeline:
Plenty of factors play a role when determining the schedule for a complete master bathroom upgrade. While no contractor can offer you an exact period of when the project is finished, it can take anywhere from four to six weeks on average.
If you want a clearer idea of what goes down during these weeks, then here’s how a usual remodeling job looks like:
Demolition: 1 to 2 Days
To start the remodeling process, you need to demolish the old bathroom to remove or dismantle existing structures or elements to prepare it for the new design. You need to take out the old fittings, floors, drywall entirely to begin the remodeling; and you can also change the layout of your bathroom at this stage.
In case your old bathroom has timber studs or fitted sheets, it will take less to demolish than the solid brick walls. If possible, have the plumbing and electrical systems disconnected in advance by professionals, too.
Framing: 2 to 4 Days
In the next step, the contractors start working on the skeleton of the space and prepares the bathroom for installation of new features like lesser walls, an additional skylight for natural lighting, overhead beams for structural integrity, and much more.
The framing stage gives you a clear sense of how the space will look and function after the remodel. It’s a critical point to ensure that the design is moving in the right direction.
Rough-in: 3 to 10 Days
Rough-in is the process of starting basic tasks like plumbing and electricals but not completing the connections. They leave it close to completion to leave room for changes until the completion of remodeling.
The plumber can start by a rough-in of the plumbing points in your master bathroom’s floors and walls. You can decide the layout of the bathroom, including where the bathtub, toilet, or sink would go. After that, the electrician can begin taking a rough-in for the wiring of all the electrical outlets.
Windows and Doors: 2 to 3 Days
Once the rough-in is complete, you can start with the windows and doors. In case you wish you change their location, you can do so in this step. If you are trying to remodel your bathroom on your budget, we recommend that you do not move any doors, windows or make any major changes to the layout.
Drywall: 2 to 5 Days
Installing drywall is a long process that may take up anywhere from 2 to 5 days. While installing may only need one day, but finishing up the drywall could take more time. It involves tasks like adding joint compound, drying it, and then sanding it for an impeccable finish.

Tiles: 3 to 7 Days
Although you can skip on it, tiles can enhance the aesthetic appeal of your master bathroom remodel. You can select from a wide range of tiles to add to the appearance of the bathroom. The process involves applying these tiles and then letting them dry, which can take a long time.
Painting: 2 to 5 Days
This next step will highly depend on your vision for the new master bathroom, but choosing paint over natural elements or tiles, which don’t require being painted over, can give the room a fresh look. It’s also much cheaper than stones or high-quality wood.
Vanity and Counters: 3 to 5 Days
Post the painting of walls, you can start to build your bathroom vanity and bathroom countertop. If your master bathroom only needs minimal counters so this step may not take much time.
Installing Fixtures: 2 to 4 Days
Moving on, in this step, you can add fixtures like sink, taps, toilets, bathtub, and others. The entire process may take around 2-4 days, depending on the amount of work involved in fixing them.
Details and Adjustments: 2 to 4 Days
Once the process is complete, you can keep 2-4 days to consider the miscellaneous work. You can work on the details or adjustments to get your master bathroom ready for use.
Other Factors to Consider:
Carrying out the complete master bathroom remodel can be a tricky task. It involves plenty of things, which can also help affect the time period of the remodeling. If you’re wondering which factors will determine the time, here are a few factors that you should consider.
Scope of the Project
The primary factor that determines the schedule of the bathroom remodel is the scope of your project. If you want to carry out a complete rebuild of the master bathroom, it will require more time.
On the other hand, the process might complete earlier in the case of a cosmetic remodel. It can take anywhere from a few days to months, depending on the project’s scope.
Materials Used
The material that you wish to use may also affect the time of your bathroom remodel. If the construction material is readily available, you don’t have to worry about any delays. On the other hand, if you want to import goods or get custom-made fittings, it may increase the time for remodeling the master bathroom.
Choosing a Contractor
You must also decide whether you want to do the remodeling work yourself or not. When you take the responsibility, it will undoubtedly need more time as you will have to find sufficient time from your busy schedule. However, you can choose a remodeling contractor to make sure your bathroom gets ready in less time.
Frequently Asked Questions
Q1. How long does it take to remodel a master bathroom?
A: On average, a master bathroom remodel can take anywhere from four to six weeks. However, the actual time can vary based on factors like the scope of the project and materials used.
Q2. What is the rough-in stage in a bathroom remodel?
A: The rough-in stage is when basic tasks like plumbing and electricals are started but not completed. This stage leaves room for adjustments until the remodeling is complete.
Q3. How can I speed up my master bathroom remodel?
A: You can speed up your remodel by choosing readily available construction materials, hiring an experienced contractor, and avoiding major layout changes.
Q4. Can I do the remodeling work myself?
A: Yes, you can choose to do the remodeling work yourself, but it may take more time as you’ll need to find time in your schedule. Hiring a contractor can help ensure your bathroom gets ready in less time.
Q5. What are some factors that affect the time of a bathroom remodel?
A: Factors like the scope of the project, availability of materials, and choice of contractor can affect the time of a bathroom remodel. More extensive projects or custom-made fittings may take longer to complete.